Timesheet approval checklist: check every person and date before handover

Use a timesheet approval checklist to check period coverage, missing days, unresolved entries and report versions. Includes a worked studio handover worksheet.

A hand adds a pale green time-record card to a complete paper bundle beside a clock

A timesheet approval checklist should establish whether every person and date in the reporting period has been checked. A report can add up correctly while leaving out a new team member, a day without clock entries or the last evening of the week. Start with coverage before signing off the total.

For a small studio, the owner may collect attendance records while a shift lead checks exceptions and another person receives the finished report. Give those people one record showing the period, outstanding questions and version being handed over. The example below is fictional and concerns attendance-record review; it does not calculate wages or determine how breaks, leave or overtime should be paid.

Define the period and the people before opening the total

Write the first date, last date, studio location and time zone at the top of the review sheet. If you use a weekly report, specify the actual dates. “Last week” becomes ambiguous when somebody opens the file several days later. Record when the source was read too, because a report taken before the final shift ends may still change.

Check the tool's date-filter instructions. A finish date might include that whole day, or the filter might stop at the beginning of it. For an evening shift crossing midnight, inspect how the tool allocates the interval between reporting periods. Test one known boundary record before accepting the range.

Build the expected people list from the team who worked during the period. Include someone who joined halfway through, someone who left before the review, and anyone whose name changed in the staff list. Use a stable internal staff reference beside the display name. A report filtered to currently active people may need an additional check for a recent leaver.

The work schedule helps identify dates to investigate. It cannot prove the actual time worked. Keep future scheduling decisions in the separate staff capacity planning worksheet.

Check each person against each relevant date

Make a small grid with one row per person and one column per date. Give each relevant cell a meaningful status: record checked, confirmed non-working day or needs information. Leave an unreviewed cell visibly unreviewed. A blank attendance result should prompt a question rather than become an automatic zero.

For a confirmed non-working day, keep the appropriate reference in the restricted attendance record. The review grid usually needs only a short label and a reference. It does not need medical details or a copied private conversation. If a person worked part of a day, retain the actual intervals and handle any absence category through the business's established process.

Compare the grid with the report's filters and included staff references. Check all pages if the raw record list is paginated. A screen showing the latest entries may omit earlier days without making the weekly summary look obviously wrong. Mark the coverage check complete only when the dates and people match the intended scope.

Keep unresolved questions separate from reviewed time

List open clock entries, missing days, overlapping intervals and changes awaiting confirmation in an exception register. Assign each question to a person and give it a review time. Use the existing missed clock-in correction worksheet when an individual entry needs investigation; link its case reference from this period review.

A rounded total cannot settle an unresolved entry. If one interval is still running after the person has left, mark that person's period as needing information until the relevant times are checked. Do not manufacture a finish from the closing hour or a start from the first client booking.

Record the scope of any approval. A reviewer might confirm that a report contains the expected people while still waiting for one time entry. Write “coverage checked; T-14 unresolved” rather than “approved”. If a deadline arrives first, tell the authorised recipient which part remains unresolved and ask how to handle it through the established process. Keep the known records available without presenting a provisional total as final.

Work through a three-person reporting period

Imagine a three-person studio reviewing November 9 to 15. Its first extract, R1, contains the following information. The figures are invented minutes from recorded intervals, with no pay or break-treatment assumptions.

Staff reference Minutes in R1 Coverage finding Period status
P01 1,800 Relevant dates checked Reviewed
P02 1,500 One day unresolved, case T-14 Needs information
P03 Missing Joined during the week; filter excluded them Needs information

R1 shows 3,300 minutes across two people. The manager confirms that P03 belongs in this period and finds 720 recorded minutes for them. Adding that person gives 4,020 minutes. P02's unresolved day remains a separate question; adding P03 does not clear it.

After the individual correction process is completed, the authorised source includes another 360 checked minutes for P02. The next extract, R2, therefore contains 1,800 + 1,860 + 720 = 4,380 minutes. That is 73 hours of recorded intervals. The difference from R1 is 1,080 minutes: 720 for the excluded person and 360 for the resolved day.

Reconcile both changes explicitly. A reviewer should find three staff references, the corrected day and no unresolved case in this example. Reaching 4,380 through some other combination would require investigation.

Separate checking, approval and handover

Name the person who checks completeness, the person authorised to approve the period and the recipient of the released record. One owner may perform several roles in a small studio. Record each action with its date and version so another person can understand what happened.

Software uses different approval rules. Clockify's approval documentation describes permissions and locked approved timesheets. Its separate submission guide explains how a chosen period reaches review. Check your provider's current instructions before assuming a saved report is submitted, approved or protected from edits.

For the fictional studio, the handover record can say: “November 9–15, studio local time; R2; three people; 4,380 minutes; coverage checked by Dana; T-14 resolved in source; authorised for handover by Lee; received by Morgan.” Add the actual timestamps and restricted file reference. Do not put access codes or client details in that message.

Replace an earlier version visibly

Save the reviewed version with a period and version identifier. Send it through the team's restricted channel and ask the recipient to acknowledge which version they received. Keep a short record of the recipient, time and any unresolved limitation. A filename ending in “final” gives no information about whether an earlier copy is still being used.

If a checked change arrives after handover, make a new version. State which staff reference and date changed, the reason, and which earlier version it replaces. Recheck the affected interval, person total and period total. Tell the recipient to replace R1 with R2 and obtain confirmation before treating the handover as complete.

For teams considering Skedful, the current pricing page lists Time Clock as an optional Pro module. Ask Skedful to demonstrate the record access, period review and handover route your team requires. Treat this worksheet as a staff procedure until the specific approval, editing or export steps have been demonstrated for your account.

Before the next reporting deadline, give a colleague the fictional R1 extract and expected three-person list. Ask them to identify the excluded person and unresolved day, then match R2 to its two changes. Put the actual period, responsible reviewer and next check time on your own review sheet.

About this article

Skedful is the publisher and corrections contact. Our editorial checklist covers product availability, source dates, worked examples and the limits of each claim.

About this article

Worked examples and sample calculations describe hypothetical scenarios. When an article cites research or customer results, follow the source for its context and limits.